Structural silicone facade
From outside you see only glass. The glass is bonded to the aluminium frame with structural silicone, leaving no visible profiles.
No visible frames: one surface of glass.
In a structural silicone glazed curtain wall, double-glazed units are bonded to aluminium carrier frames with structural silicone. From outside the frames are invisible, with only slim silicone joints between the panes. Where opening vents are needed, concealed vents look the same as the fixed glass from outside.
- APPEARANCE
- No visible profiles outside, slim silicone joints
- GLASS
- Double glazing; reflective, tinted or clear
- GLASS FIXING
- Structural silicone
- OPENING VENT
- Concealed, outward-opening
- PROFILE SERIES
- Asaş E50 series
From survey to handover
STEPS TO BE CONFIRMED WITH THE COMPANY- 01Survey and measuringThe facade is measured on site and the module layout is drawn up from the architectural design.
- 02Structural design and detailingWind loads and anchor points are determined and the facade details are prepared.
- 03Frame installationAnchors are fixed to the floor slabs and the vertical and horizontal aluminium members are installed.
- 04GlazingThe glass is bonded to the carrier frames with structural silicone and the frames are fixed to the structure.
- 05Sealing and handoverJoints are sealed with silicone, weathertightness is checked and the facade is handed over.
Projects with this system
9 PROJECTSFrequently asked
What is the difference between a silicone facade and a capped facade?
In a silicone facade the glass is bonded to the frame and no profiles are visible from outside. In a capped facade the glass is held mechanically by aluminium caps, which show as lines on the facade.
Can windows open in a silicone facade?
Yes. Concealed vents look the same as the fixed glass from outside and open outwards.
Which buildings is it suitable for?
Office buildings, business towers, hospitals and shops where a smooth, all-glass appearance is wanted.
Can broken glass be replaced?
Yes. The broken unit is removed and a new one is bonded and refitted. The work is planned around access to the facade.
How is it maintained?
The glass is cleaned regularly and the condition of the silicone joints is checked periodically.